Skip To Site Navigation

Stanmore Hall Main Entrance Facelift

The main entrance to the hall was built around 1850. After years of neglect and weathering, it was given a facelift with a combination of new stone to the left hand side and stone repair render, as well as some repointing and cleaning.

Front Entrance Before Facelift Front Entrance Before Facelift
Front Entrance After Facelift Front Entrance After Facelift
Front Entrance After Facelift Front Entrance After Facelift
Front Entrance After Facelift

Oliver Gill (Stonemason)
107c Blenheim Crescent, Kensington, London, W11 2EQ, England
Tel: 0207 2217674 Mobile: 07826 655787 Email:

Back To Church & Other Public Building Projects Main Page